Language:
You are here: Home >> News >> Heat recovery process eases the load of the heat exchanger

News

Heat recovery process eases the load of the heat exchanger

2011-6-12

Keep high temperature may be the last thing you think when you change the heat exchanger system, but a model for the use of time for hot water heating and air cooling.
The aptly named Air Conditioner Water Heater, or ACWH Hotspot energy a capacitor that is located outside the building, gathering heat, compresses air and exhibits inside. The heat passes through a heat exchanger copper that connects a house or a hot water tank construction. According to the company, the unit can cool a room of 1000 square meters and heat around 100 liters of water per day. At its peak, can provide ACWH 18,000 BTU, 1.5 tons of cooling per 1333 watts per hour.
Water heating and cooling of the building to save energy because the heat recovery process to facilitate the loading of heat exchanger. The equipment must be installed relatively close (preferably within 150 m) water heaters, however, and only heats the water when the heat exchanger is running, and there is not enough hot water hot air. Using a mild summer day, the unit does not make a significant dent in the cost of heating water, but it could have affected the houses where there are several people using the hot water for showers all day or wash the dishes.
Dawn Air Conditioning Co., Ltd., which makes the ACWH see tall buildings solar thermal, ripe for collecting heat. Although the unit can be installed anywhere, was designed with the southern United States in mind, where many people use heat exchanger in spring and autumn, most of the summer. Commercially, the company plans to restaurant kitchens, laundries and server rooms that benefit from their technology.
 

Contact Us







Contact Us

Send Results

Thank you ! The Message is Send.
We will contact you as soon as possible and offer you the corresponding services!

Send Results

Sorry, The message don't send, Service don't work now.